Inspections

It is the responsibility of the owner or designated representative to call for inspections as construction proceeds.  Failure to call for inspection at the appropriate time may result in project delays.  All work to be inspected must be visible and not concealed by further construction.

When requesting an inspection please provide the permit number, site address and owner’s name as well as the type of inspection required.  We require at least three business days notice to be able to schedule your inspection.

Permit documentation must be on site for each inspection and made available to the Building Official, please also ensure that the permit identification sign is posted so it is clearly visible from the road.

Required Building Inspections:

1. SITING

After excavation and footing formwork is complete, BEFORE placing concrete.

2. DAMP PROOFING &

PERIMETER DRAINAGE

Tie holes filled, after the application of foundation damp proofing and installation of foundation perimeter drainage pipe covered by drain rock BEFORE backfilling.

3. PLUMBING (underslab)

Groundwork completed. Drains under test with a 3 metre head of water BEFORE BACKFILLING. 

 4. SLAB PREP & RADON PIPE

Under slab damp-proofing and soil gas barrier installed with required under slab insulation for heated slab or no insulation with unheated slab and a 4” radon collection pipe bedded in 4” thick layer of clean granular crush BEFORE PLACING CONCRETE.

5. FRAMING & ROUGH PLUMBING

(requested as ONE inspection)                                                                  

Framing completed to lock-up stage with windows and exterior doors installed (temporary labels in place for inspection)

Electrical and mechanical rough-in completed;

P. Eng. sealed manufactured beam and joist specifications on site

P. Eng. sealed truss specification with layout on site

Mechanical ventilation checklist completed and on site

Rough-in plumbing to be under test; schedule WITH FRAMING inspection

Radon pipe installed up and through roof

Exterior air barrier complete BEFORE INSULATION

6. INSULATION

Insulation and vapour barrier installed; BEFORE installation of drywall.

7. OCCUPANCY

With ALL life safety components completed and installed: smoke alarms, handrails, guards on stairs and decks, minimum of one completed washroom, kitchen sink and exhaust fan installed,  heating system complete, etc.

8. FINAL

When the work authorized under a building permit has been completed.

9. OTHER INSPECTIONS

As directed by the Building Official.

Note: Fewer inspections may be required for smaller buildings, please consult the Building Official. 